Service overview

Geotechnical design services overview

Geotechnical design uses soil investigation results to calculate and detail foundations, piles, retaining walls and ground improvement so that structures remain stable throughout their service life. SPN's strength is that the investigation team and the design team work together — no soil data is lost along the way, and designs can be adjusted quickly to actual site conditions.

Scope

Scope covered

  • Spread footings, driven/bored piles, micropiles and settlement analysis
  • Retaining walls, bracing, dewatering and riverbank protection
  • Soft soil improvement, slopes, embankments and slabs on fill
  • On-site pile problems, strengthening existing foundations and design review
When to use

When it is needed

  • Building on soft soil or sloping ground
  • Basement or deep pit excavation near existing buildings
  • Land filling for project or factory sites
  • Pile problems during construction, or existing foundations need strengthening
Deliverables

Deliverables

  • Full calculation sheets signed by a COE-licensed engineer
  • Construction drawings: plans, sections and reinforcement schedules
  • Slope Stability / FEM analysis results with FS values
  • Construction sequence and testing/monitoring plan
Foundation Design

What does foundation and pile design need to analyze?

Using actual site soil investigation results, we design spread, combined and mat foundations, driven piles, bored piles and micropiles, with analysis of pile groups, downdrag, and immediate and long-term settlement.

Shallow Foundation

Spread, combined and mat foundation design

Shallow foundations for competent soils — bearing capacity calculation and settlement checked against acceptance criteria

TerzaghiMeyerhofACI 318
Spread footing or piles? →
Pile Foundation

Driven pile, bored pile and micropile design

Pile type, size and depth selected from actual SPT data, with verification testing specified by PDA or Static Load Test

Static FormulaAASHTO LRFD
Types of piles →
Pile Group & NSF

Pile group and downdrag analysis

Single and group pile capacity, Group Efficiency, Block Failure and Negative Skin Friction in subsiding ground

Group EfficiencyNSF
Negative skin friction (NSF) →
Settlement Analysis

Immediate and long-term settlement analysis

Immediate, consolidation and secondary settlement calculated from soil Eu, Cc, Cv and Cα — predicting settlement magnitude and time

ConsolidationCc · Cv
Foundations on soft clay →
Lateral & Uplift Pile

Uplift and lateral pile design

Piles for solar farms, power poles, sign poles and wind-loaded structures — uplift, lateral load and tension reinforcement checks

Bromsp-y Curve
Lateral Load Test →
Machine Foundation

Machine foundation design

Foundations for rotating and impact machinery — natural frequency checked to avoid resonance and vibration limited to manufacturer criteria

ACI 351.3RDynamic Analysis
Retaining & Excavation

Which earth-retaining system does a deep excavation need?

Selected by depth, soil profile and adjacent buildings — from steel sheet piles, soldier piles, contiguous pile walls and diaphragm walls to cantilever, counterfort and gabion walls — with struts, ground anchors and dewatering to control deformation so adjacent buildings are not affected.

Sheet Pile & Soldier Pile

Steel sheet pile and soldier pile design

U/Z sheet piles and H-pile + lagging for temporary and permanent excavations — earth pressure and safe embedment depth calculated

RankineCoulomb
Compare 7 retaining wall types →
Diaphragm & Pile Wall

Diaphragm wall and contiguous pile wall design

Urban deep excavations — wall deformation analyzed by FEM and impact on adjacent buildings checked

PLAXIS 2D/3DFEM
Case study: 4 m deep excavation →
Dewatering & Impact

Dewatering design and adjacent-impact assessment

Dewatering systems for excavations — basal heave / piping checks and settlement assessment of adjacent buildings, with an instrumentation plan

SeepageMonitoring Plan
Groundwater and foundations →
Riverbank Protection

Riverbank protection and waterfront wall design

Stability under rapid drawdown and erosion analyzed — bank protection system selected to suit the soil profile

Slope/WRapid Drawdown
Preventing riverbank collapse →
Ground Improvement & Slope

What methods are there for soft soil improvement and slope problems?

PVD with preloading to accelerate settlement, DCM and cement grouting, stone columns for soft soil, and stability analysis of slopes, cut slopes, embankments and slabs on fill — for Central Thailand soft soils and sloping sites.

PVD + Preloading

PVD and preloading design to accelerate settlement

PVD spacing, depth and fill height specified, consolidation time calculated, with a Settlement Plate / Piezometer monitoring plan

BarronHansbo
What is PVD + Preloading →
Deep Mixing & Grouting

DCM and cement grouting design

Cement content, soil-cement column size and spacing specified — to strengthen soft soil under foundations or form a cutoff wall

DCMGrouting
8 soft soil improvement methods →
Stone Column

Stone column design for soft soil

Increases bearing capacity and reduces settlement of soft soil under roads, factories and liquid storage tanks, and aids drainage

Priebe Method
Slope Stability

Slope and cut slope stability analysis

Factor of Safety by Bishop, Spencer and Morgenstern-Price, drained / undrained, with remedial measures designed

Slope/WPLAXIS
Safe slope FS values →
Embankment & Seepage

Embankment and earth dam design with seepage analysis

Road embankments on soft soil, levees and earth dams — seepage, pore water pressure and stability analyzed for all operating conditions

SEEP/WSlope/W
Slab-on-Grade

Slab-on-grade and warehouse floor design

Factory floors for racks, forklifts and distributed loads on fill/soft soil — choosing between slab-on-grade and pile-supported slab from settlement analysis

ACI 360RPlate Bearing
Fixing settling fill →
Assessment & Consulting

What if site piles have problems or existing foundations need strengthening?

Engineers assess and design remediation for defective piles, strengthen existing foundations and extensions, assess seismic and liquefaction risk, analyze pile driving (Driveability) and review designs — so decisions can be made quickly, backed by numbers.

Pile Remedial

Defective pile assessment and remedial design

Off-center piles, piles shorter than design, piles failing the Seismic Test — impact calculated and additional piles, enlarged footings or tie beams designed

EccentricityPile Cap Redesign
What to do with off-center piles →
Underpinning & Extension

Strengthening of existing foundations and extension foundations

Micropiles added under existing foundations; extension foundations designed so they do not settle differently from the existing building and cause cracks

Micro PileFHWA
Strengthening existing foundations →
Seismic & Liquefaction

Seismic and liquefaction assessment

Site Class classification per DPT 1301/1302-61, liquefaction potential and its effect on foundations assessed

DPT 1301/1302-61Site Class
Which soils risk liquefaction →
Wave Equation Analysis

Pile driving analysis (Driveability)

Hammer size and drop height selected, blow count and driving stresses in the pile estimated before actual driving starts

GRLWEAPDriveability
What is Wave Equation →
Crane Pad & Platform

Crane pad and piling rig platform assessment and design

Bearing pressure under outriggers and crawler tracks assessed, platform thickness specified, and soil capacity verified by Plate Bearing Test

Bearing CheckPlate Bearing
Plate Bearing Test →
Design Review & VE

Design review and Value Engineering

Review of foundation, pile and earth-retaining designs, proposing lower-cost alternatives that still meet safety criteria

Peer ReviewVE
Already have drawings or soil boring results? Let an engineer review them first

Send drawings, soil investigation results or site photos via LINE — we reply with a design approach and a quotation within 24 hours.

Real projects

Geotechnical design projects: 3 case studies

Real project examples, from survey data and Slope/W and FEM analysis to 3D construction drawings — tap an image to view full size

Hillside · Cut & Fill

Cut slope and retaining walls on sloping ground

Grading a sloping site into 2 zones, with a stepped cut slope and gabion retaining walls designed from drone imagery, a topographic map and 4 boreholes

FS 3.709Slope/W
4 boreholesBH-01 to BH-04
FEMGabion Wall
Soft Clay · Fence Wall

Fence retaining wall on soft clay

Fence retaining walls in 5 types by fill height, using a King & Anchor Pile system, with movement analyzed in PLAXIS 3D and quantities taken off from a BIM model

5 typesFill 0.50–2.50 m
PLAXIS 3DStage Loads
BIMQuantity takeoff
Temporary Works

Temporary earth retaining: contiguous pile wall

Contiguous bored pile wall with cap beam for a 4 m deep excavation — checks of excavation slope stability, movement at the pit-opening stage and pile section capacity

4 m deep excavationØ0.35 m @0.40 m
FS 5.092Cut Slope 1:1
6-DB16Interaction Diagram
Our process

How does geotechnical design with SPN work?

The investigation and design teams work back-to-back — no soil data is lost, and designs adapt quickly to actual site conditions.

  1. Send project information

    Architectural drawings, loads, site plan and soil investigation results (if any) — send via LINE or email anytime

  2. Data review and quotation

    The engineer checks whether the soil data is sufficient; if not, we propose an additional soil investigation plan, with a quotation within 24 hours.

  3. Analysis and comparison of options

    Analysis with Slope/W, PLAXIS or standard calculation methods, comparing options for safety, cost and construction time

  4. Detailed design

    Calculation sheets, construction drawings, detail drawings, and material specifications/construction sequence

  5. Review and sign-off

    Internal review and signature by a COE-licensed engineer, ready for submission to the relevant agencies

  6. Construction support

    Specifying pile testing and instrumentation, and adjusting the design to actual site results

Inputs and deliverables

What to prepare and what you will receive

Actual scope depends on the type of work; the engineer will list the required inputs and deliverables in the quotation.

Design inputs

  • Soil investigation resultsBoring Log, SPT N-Value, lab results and groundwater level — none yet? SPN can drill them in the same project
  • Drawings and loadsPreliminary architectural/structural drawings, foundation loads, or machine/crane specifications
  • Site plan and levelsExisting ground and fill levels, boundaries and topographic map (we can survey it)
  • Site constraintsAdjacent buildings, boundary clearance, underground utilities and owner/agency requirements

What you receive from SPN

  • Full calculation sheetsSigned by a COE-licensed engineer, for permit submissions
  • Construction drawingsPlans, sections, details and reinforcement schedules
  • Analysis reportSlope Stability / FEM with plots, FS values and deformation
  • Specifications and construction sequenceExcavation, fill and bracing steps, and acceptance criteria
  • Testing and monitoring planNumber of test piles, instrument locations and alarm levels
  • 3D / BIM modelWhere defined in the scope, for communication and quantity takeoff

What is geotechnical design?

Geotechnical engineering design uses data from soil investigation — such as SPT N-Values, lab test results and groundwater level — to calculate and design foundations, piles, retaining walls, soft soil improvement and slope stability, so that structures are safe, economical and do not settle beyond allowable limits throughout their service life.

Geotechnical and Soil Mechanics Design Services — SPN Soil Engineering

SPN Soil Engineering provides end-to-end geotechnical and soil mechanics design by experienced engineers working directly from soil investigation data — from house foundations, retaining walls, soft soil improvement and slope stability analysis with Slope/W and PLAXIS to assessment and remedial design of foundations on site. Every design is certified by a COE-licensed engineer and usable for building-permit submissions and other relevant agencies.

Full technical details — calculation methods, standards and scope

1. Foundation and Pile Design (Foundation Design)

We design the foundation best suited to the soil conditions, loads and project budget, using SPT N-Value and lab test data from the soil investigation.

  • Shallow Foundation Design — spread and combined footingsDesign of Spread Footings, Combined Footings and Mat Foundations for sites where the soil has sufficient bearing capacity. Bearing Capacity is calculated per Terzaghi, Meyerhof and Hansen, and Settlement is checked against acceptable limits.
  • Pile Foundation Design — driven piles, bored piles, micropilesSelection of the most economical pile type (Driven Precast, Bored Pile, Micro Pile, Barrette), size and depth using actual SPT N-Value data. Ultimate Pile Capacity is calculated with the Static Formula and verified by PDA or Static Load Test.
  • Pile Capacity Analysis — load capacity analysisAnalysis of single pile capacity and Group Effect, calculation of Negative Skin Friction in areas of ground settlement, and design of Pile Caps and Rafts for uniform load distribution.
  • Settlement Analysis — settlement analysisCalculation of Immediate Settlement, Primary Consolidation Settlement and Secondary Compression using Cc, Cv and the Secondary Compression Index (Cα) from the Consolidation Test, predicting settlement time and final settlement magnitude.
  • Lateral & Uplift Pile — uplift and lateral pilesPile design for solar farms, high-voltage transmission towers, sign poles and wind-loaded structures. Uplift capacity is calculated from skin friction, and lateral capacity by the Broms method or p-y curves, checking pile-head displacement, bending moment and tension reinforcement, with a proposed Uplift Test and Lateral Load Test plan.
  • Machine Foundation — machine foundationsFoundation design for rotating machinery such as pumps, compressors and generators, and for impact machinery, following ACI 351.3R. The natural frequency of the foundation-soil system is analyzed to stay clear of the operating frequency, vibration amplitude is checked against manufacturer criteria, and the machine foundation is isolated from the building floor to reduce vibration transmission.

2. Retaining Wall and Earth Structure Design (Retaining Structure Design)

Design of all types of earth-pressure-resisting structures for temporary and permanent excavations in urban and confined sites — read more: Which retaining wall to choose? 7 types compared and Retaining walls under the Ministerial Regulation B.E. 2566 (2023): the 3 FS checks to pass

  • Sheet Pile and Soldier Pile DesignDesign of steel Sheet Piles (U-type, Z-type) and Soldier Piles (H-Pile + Lagging) for temporary and permanent excavations. Earth Pressure is calculated per Rankine and Coulomb, with Anchor and Strut systems designed alongside.
  • Diaphragm Wall DesignDesign of reinforced concrete walls cast in a trench (Slurry Wall) for very deep urban excavations — high stiffness, good watertightness and low deformation — analyzed by FEM (PLAXIS) with checks of impact on adjacent buildings.
  • Gravity, Cantilever and Counterfort Retaining WallDesign of all types of concrete retaining walls to ACI 318 and EIT standards, checking Sliding, Overturning, Bearing Capacity and Settlement to pass every Failure Mode.
  • Anchor and Strut SystemDesign of bracing (Strut) and tie-back (Ground Anchor / Tie-back) systems for deep excavations, calculating Prestress, Free Length, Bond Length and anchor Group Effect per BS 8081 and FHWA.
  • Dewatering and adjacent-impact assessmentDesign of groundwater lowering systems so excavation can proceed in the dry, checking Basal Heave, Piping and water pressure beneath the excavation base, and assessing settlement of soil and adjacent buildings from dewatering and wall deformation, with instrumentation (Inclinometer, Piezometer, Settlement Point) and alarm levels specified for construction.
  • Riverbank Protection — bank protection and waterfront wallsDesign of riverbank protection and waterfront walls to suit the soil profile, analyzing stability under Rapid Drawdown, water pressure behind the wall and toe erosion with Slope/W — read more: Preventing riverbank collapse: how to design a waterfront retaining wall

3. Soft Soil Improvement and Slope Stability Analysis (Ground Improvement & Slope Stability)

Solving soft soil problems in Central Thailand and coastal areas, with slope safety analysis using internationally standard software — read more: How many Ground Improvement methods are there? 8 soft soil methods summarized

  • Preloading with PVD Design — temporary surcharge and Prefabricated Vertical DrainsDesign of the PVD Layout (spacing, pattern, depth) and Surcharge Height to accelerate soft soil consolidation, calculating the Time Rate of Consolidation with Barron's Solution and tracking progress with Settlement Plates and Piezometers.
  • Deep Mixing (DCM) and Cement GroutingDesign of Deep Cement Mixing to strengthen soft soil under foundations or form a cutoff wall, specifying Cement Content, Water-Cement Ratio and Column Spacing, plus Grouting design to fill voids and cracks in soil and rock.
  • Stone Column Design — stone columns and Vibro CompactionDesign of Stone Columns to improve soft soil under heavy loads such as roads, factories and water tanks, calculating the Bearing Capacity Improvement Factor, Settlement Reduction Factor and Drainage Effect.
  • Slope Stability Analysis — with Slope/W and PLAXISStability analysis of slopes and embankments by the Bishop, Janbu and Morgenstern-Price methods in Slope/W (GeoStudio), calculating the Factor of Safety (FS) for both Drained and Undrained Conditions, and designing remedial measures when FS does not meet the criteria.
  • Embankment and Earth Dam — embankments and seepageDesign of road embankments, levees and earth dams on soft soil, analyzing seepage with SEEP/W for the phreatic line, pore water pressure and Exit Gradient, together with Slope/W for the construction, normal operation and rapid drawdown conditions, and designing staged filling (Stage Construction) when the foundation soil lacks capacity.
  • Slab-on-Grade — ground-supported slabs and warehouse floorsDesign of factory and warehouse floors for Selective Racks, forklifts and distributed loads following ACI 360R, using the Modulus of Subgrade Reaction (k) from a Plate Bearing Test and analyzing settlement of fill and soft soil to decide between a slab-on-grade and a pile-supported slab.

4. Foundation Assessment, Remediation and Consulting (Assessment & Consulting)

Solving pile and foundation problems found during construction or in service, plus specialist analysis before pile driving and heavy lifts begin.

  • Pile Remedial — defective pile remediationFor piles with excessive eccentricity, piles that did not reach design level, broken piles, or piles failing the Seismic Integrity Test, we assess the remaining capacity and additional moment, then design the fix, such as additional piles, enlarged footings or tie beams — read more: What to do with off-center piles and Piles shorter than design
  • Underpinning — strengthening existing foundations and extensionsDesign of Micro Piles under existing foundations per FHWA guidance for buildings that have settled or must carry additional load, and design of extension foundations structurally separated from the existing building to reduce differential settlement — read more: House extensions without settlement and cracks
  • Seismic Site Class and LiquefactionSite classification per DPT 1301/1302-61 from investigation data, assessing the liquefaction potential of loose saturated sand layers and its effect on pile capacity — read more: Which soils risk liquefaction
  • Wave Equation Analysis (GRLWEAP)Pile driving simulation before mobilization: selecting hammer size and drop height, estimating blows per penetration, and checking compressive/tensile driving stresses in the pile against material strength — used together with field PDA Test results.
  • Crane Pad and Working PlatformChecking soil capacity under mobile crane outriggers and piling rig crawler tracks, specifying the crushed rock layer or mat thickness, and verifying soil capacity by Plate Bearing Test before heavy lifts.
  • Design Review and Value EngineeringReview of calculation sheets and drawings for foundations, piles and earth-retaining systems, identifying risks and proposing cost-saving alternatives, such as adjusting pile type or length from actual soil data, while still meeting safety criteria.

Geotechnical design services summary table

← Scroll to see the full table →

ServiceSoftware/standardOutputDurationBest for
Shallow FoundationTerzaghi, Meyerhof, ACI 318Foundation drawings + report3–7 daysHouses, buildings on firm soil
Pile FoundationStatic Formula, AASHTOPile drawings + report5–14 daysBuildings, factories, bridges
Settlement AnalysisConsolidation TheorySettlement curves + report3–7 daysSoft soil, embankments
Sheet Pile / AnchorRankine, FHWA, BS 8081Drawings + report5–10 daysDeep excavations
Diaphragm WallPLAXIS FEM, ACIDrawings + FEM Report10–21 daysUrban deep excavations
PVD + PreloadingBarron's SolutionPVD drawings + Timeline5–14 daysCentral Thailand soft soil
Stone ColumnPriebe MethodDrawings + report5–10 daysHeavily loaded soft soil
Slope StabilitySlope/W (GeoStudio)FS Report + remedial drawings3–10 daysEmbankments, Cut Slope
Lateral / Uplift PileBroms, p-y CurvePile drawings + calculation sheetsPer scope of workSolar Farm, power poles, sign poles
Machine FoundationACI 351.3RFoundation drawings + Dynamic CheckPer scope of workFactories, heavy machinery
Dewatering + ImpactSeepage AnalysisDewatering drawings + monitoring planPer scope of workDeep excavations next to buildings
Riverbank ProtectionSlope/W (Rapid Drawdown)Drawings + reportPer scope of workRiverbanks, ports
Embankment / Earth DamSEEP/W, Slope/WSeepage + FS ReportPer scope of workEmbankments, reservoirs
Slab-on-GradeACI 360R, Plate BearingSlab drawings + calculation sheetsPer scope of workFactories, warehouses
Pile RemedialEccentricity CheckCalculation sheets + remedial drawingsPer scope of workOff-center piles, short piles
UnderpinningMicro Pile, FHWAFoundation strengthening drawingsPer scope of workSettled buildings, extensions
Seismic / LiquefactionDPT 1301/1302-61Site Class + reportPer scope of workSeismic risk areas
Wave EquationGRLWEAPHammer/drop height + Blow CountPer scope of workBefore pile driving starts
Crane PadBearing Check, Plate BearingPlatform thickness + reportPer scope of workCrane lifts, piling rigs
Design Review / VEDesign reviewReview report + alternativesPer scope of workProject owners, contractors

Software and standards used in design

  • Slope/W — GeoStudio (Seequent/Bentley)Slope stability analysis by all Limit Equilibrium methods (Bishop, Janbu, Morgenstern-Price, Spencer), supporting both Deterministic and Probabilistic Analysis.
  • PLAXIS 2D/3D — Finite Element MethodStress-Strain analysis of soil and earth-retaining structures in complex conditions such as Diaphragm Walls, Deep Excavations and Embankments on soft soil, giving accurate Deformation and structural Forces.
  • ACI 318 and EIT standardsReinforced concrete design of foundations, retaining walls and underground structures to the American standard (ACI 318) and the standards of the Engineering Institute of Thailand.
  • AASHTO LRFD, BS EN 1997 (Eurocode 7)Design of bridge foundations, infrastructure and geotechnical works to international standards.
  • SEEP/W — GeoStudioGroundwater seepage analysis — phreatic line and pore water pressure in embankments, earth dams and deep excavations — used together with Slope/W.
  • GRLWEAP — Wave Equation AnalysisPile driving simulation to select the hammer and estimate Blow Count and driving stresses in the pile.
  • ACI 351.3R and ACI 360RGuides for machine foundations (Foundations for Dynamic Equipment) and slabs-on-ground (Slabs-on-Ground).
  • DPT 1301/1302-61Standard for the seismic-resistant design of buildings, used for site classification in foundation design.

Projects SPN designs

  • Houses, commercial buildings, condominiumsEconomical and safe foundation and pile design, certified by a licensed engineer, usable for building-permit submissions and other relevant agencies.
  • Factories, warehouses, industrial estatesDesign of heavily loaded foundations and concrete floors, with soft soil settlement analysis so production is not affected.
  • Bridges, roads and infrastructureBridge foundation design, road embankments on soft soil, and slope stability analysis of road slopes.
  • Dams, reservoirs, hydropower projectsEarth dam design with Seepage and Slope Stability analysis for both normal and emergency conditions.
  • Solar Farm, Wind Farm and energy projectsPile design for solar panel mounting structures resisting uplift and lateral loads, and wind turbine foundations as spread footings or piled rafts (Piled Raft) to suit the site soil profile.

Key facts: what you get from SPN geotechnical design and how many days it takes

Service
Foundations and piles · Retaining walls and deep excavations · Soft soil improvement and slopes · Foundation assessment, remediation and consulting
Analysis tools
Slope/W · PLAXIS · ACI 318 · ACI 351.3R (machine foundations) · BS 8081 (Ground Anchor)
Approximate duration
Houses 3–7 working days after complete soil data · Commercial buildings 1–2 weeks · Factories 2–4 weeks
Deliverables
Full calculation sheets and construction drawings signed by a COE-licensed engineer, for permit submissions
Service area
Nationwide, all 77 provinces, from our office in Bang Sao Thong, Samut Prakan
Contact
Tel +66 64 746 9601 · LINE @spnth · info@spnth.com

Frequently asked questions — geotechnical design

A Boring Log with SPT N-Value for every soil layer, lab test results such as Atterberg Limits, Consolidation Test, Triaxial or Direct Shear, and the groundwater level. SPN can provide soil investigation alongside design in the same project.

It is the stability analysis of slopes and embankments, calculating the Factor of Safety (FS) with Slope/W or PLAXIS. FS ≥ 1.5 is considered safe for permanent slopes. It should be done before building embankments, roads on soft soil, cut slopes and all deep excavations.

PVD (Prefabricated Vertical Drain) is a vertical drainage strip installed into soft soil with a steel mandrel, combined with a temporary surcharge fill, to accelerate soil consolidation — cutting the waiting time from several years to 3–12 months. It suits roads, airports and projects on soft soil in Central Thailand.

Steel sheet piles are used for temporary or permanent excavations, install quickly and cost less, but water may leak through the interlocks. A diaphragm wall is a concrete wall cast in a trench — stiff, more watertight and with less deformation, suited to very deep urban excavations.

Commonly used criteria: FS ≥ 1.5 for permanent slopes in the long-term (drained) condition and FS ≈ 1.2–1.3 for temporary slopes or during construction (short-term, undrained). Rapid drawdown and seismic cases use specific criteria from the referenced standard. The value actually used depends on the importance of the structure, the risk and the project requirements.

Design based on actual soil data selects the most suitable pile, sets the correct depth and spacing, avoids overly conservative design, and prevents later settlement problems whose repair costs are often many times the design fee.

Yes. Design reports and construction drawings are certified by a COE-licensed civil engineer and can be submitted to the Subdistrict Administrative Organization (SAO), the municipality, the Bangkok Metropolitan Administration (BMA) and other relevant agencies.

A typical house takes 3–7 working days after complete soil data is received, a commercial building 1–2 weeks, and an industrial factory 2–4 weeks. SPN can run soil investigation and design in parallel to shorten the overall schedule.

Besides compression, uplift from wind and lateral load with moment at the pile head must be checked using the Broms method or p-y curves from actual soil data, along with tension reinforcement, and should be verified by Uplift and Lateral Load Tests in the field. Read more: Uplift Test · Lateral Load Test

The engineer must first calculate the additional moment from eccentricity and the actual remaining pile capacity, then choose a fix such as enlarging the footing, adding piles or adding tie beams. SPN provides assessment and remedial design with calculation sheets. Read more: Off-center piles · Piles shorter than design

The earth-retaining system (e.g. sheet pile, contiguous pile wall or diaphragm wall), the bracing system and the dewatering system must be designed, basal heave checked and settlement of adjacent buildings assessed, with an instrumentation plan such as inclinometers and settlement points during construction. Read more: Deep excavation monitoring

Foundation and earth-retaining design requires soil data from the actual site. If none exists, SPN plans the number and depth of boreholes to suit the design, then carries out the investigation and design back-to-back in the same project — shortening the overall schedule with no need to coordinate multiple contractors. Read more: Soil investigation services