Service overview

Geotechnical instrumentation service overview

Geotechnical Instrumentation is equipment that detects changes in soil and structures that cannot be seen by eye. Settlement Plates measure settlement, Inclinometers measure lateral movement and Piezometers measure pore water pressure. This continuous data lets engineers slow down or adjust construction methods before real damage occurs

Scope

Scope of work

  • Settlement: Settlement Plate · Deep Settlement · Extensometer
  • Pore pressure: Piezometer · Observation Well
  • Movement: Inclinometer · Tiltmeter · Total Station / Prism
  • Structural loads, adjacent buildings, Crack Meter and Vibration (PPV)
When to use

When to use

  • Deep excavations and retaining walls
  • Embankments and high fills on soft soil
  • Tunnels, piling or construction next to adjacent buildings
  • Projects requiring monitoring under EIA conditions
Deliverables

Deliverables

  • As-built locations and depths of instruments
  • Baseline readings and periodic reports with trend charts
  • Datalogger system with LINE / SMS / Email alerts when readings exceed criteria
  • Summary report signed by a COE-licensed engineer
Settlement Monitoring

Which instruments measure soil settlement?

Settlement Plates, Deep / Multi-level Settlement Points, Surface Settlement Markers and Extensometers track settlement from the ground surface to deep soil layers, to verify the design and the progress of consolidation

Settlement Plate

Settlement plate under fill

A 60×60 cm steel plate placed at the base of the fill, with a steel rod extended above the surface; levels read with an Auto Level every round

  • Measures settlement under embankments and fill
  • Best for roads, embankments, Preloading / PVD
How it is monitored →

Deep / Multi-level Settlement Point

Deep settlement markers

Anchors set at several depths to show which soil layer settles the most

  • Measures settlement of each soil layer
  • Best for soft clay, verifying Consolidation results
Bang Na case study →

Surface Settlement Marker

Surface settlement markers

Markers on the ground, roads and sidewalks around the excavation, read against benchmarks outside the zone of influence

  • Measures ground settlement or heave around the project
  • Best for deep excavations, tunnels, underground pipes
Plan deep excavation monitoring →
Rod / Magnetic

Extensometer

Movement along a borehole

Rod Extensometers anchor rods at several depths; Magnetic Extensometers use magnetic rings around a pipe, read with a probe

  • Measures settlement or Heave with depth
  • Best for deep excavation bases, high embankments, tunnels
Pore Pressure & Groundwater

Which instruments measure pore pressure and groundwater level?

Standpipe Piezometers, Vibrating Wire Piezometers and Observation Wells measure pore water pressure and groundwater level to assess stability and the effects of drainage

Standpipe Piezometer

Open standpipe piezometer (Casagrande)

Tip set in a filter sand zone, sealed above with Bentonite, water level read with a Water Level Meter; low cost, suitable for long-term use

  • Measures water pressure in a specific soil layer
  • Best for long-term monitoring, projects with EIA conditions
Standpipe vs Vibrating Wire →
ASTM D7764

Vibrating Wire Piezometer

Vibrating wire piezometer

Fast response, high resolution, can connect to a Datalogger for automatic readings; every sensor is acceptance-tested before installation

  • Measures pore water pressure (kPa)
  • Best for deep excavations, Preloading, embankments
Samut Prakan case study →

Observation Well

Groundwater observation well

Slotted pipe across the aquifer, used to track seasonal water levels and the effects of dewatering during construction

  • Measures groundwater level of the aquifer
  • Best for Dewatering, environmental work
How to install and read →
Lateral Movement & Tilt

Which instruments measure lateral movement and tilt?

Inclinometers, Tiltmeters and Total Station / Prism Monitoring detect movement of soil, retaining walls and structures before damage occurs

ASTM D6230

Inclinometer

Lateral movement with depth

A probe is lowered into an Inclinometer casing installed in soil or a wall, tilt read every 0.5 m, then the displacement profile is calculated over the full depth

  • Measures lateral movement (mm) with depth
  • Best for retaining walls, slopes, dams
Principles and reading results →

Tiltmeter

Structural tilt

Installed on columns, walls or retaining walls; read with a portable readout or connected to a Datalogger for real-time alarms

  • Measures tilt of buildings and walls
  • Best for adjacent buildings, retaining walls
Point layout and alarm criteria →
3D

Total Station / Prism Monitoring

3D movement survey points

Prism targets fixed on buildings, walls or key structures, sighted with a Total Station from benchmarks to get X-Y-Z movement

  • Measures 3D movement of structures
  • Best for excavation next to buildings, railways, bridges
SPN surveying services →
Load & Stress

Which instruments measure forces in struts, anchors and piles?

Strain Gauges, Load Cells, Earth Pressure Cells and Instrumented Piles measure the actual forces in struts, ground anchors, walls and piles for comparison with design values

Strain Gauge

Vibrating Wire strain gauge

Welded or embedded on struts, rebar or concrete; strain converted to force using section properties

  • Measures strain (με) → member force
  • Best for Strut, Waler, Pile Cap
Converting strain to force →

Load Cell

Direct force in struts and ground anchors

Installed between the strut end and the waler or under the Ground Anchor head; force read directly without section conversion

  • Measures compression or tension (kN)
  • Best for Strut, Ground Anchor, Tie-back

Earth Pressure Cell

Earth pressure on structures

A fluid-filled cell connected to a pressure transducer, set on the wall face or under a footing to measure actual total earth pressure

  • Measures total earth pressure (Total Pressure, kPa)
  • Best for retaining walls, under footings, embankments
ASTM D1143

Instrumented Pile

Instrumented test pile

Strain Gauges at several levels and Telltales in a static load test pile, separating skin friction in each soil layer from end bearing

  • Measures load distribution along the pile
  • Best for verifying pile design on large projects
Test details →
Adjacent Buildings & Vibration

Building next to adjacent structures: what needs monitoring?

Carry out a Pre-construction Condition Survey to record existing conditions before work starts, then monitor Building Settlement Points, Crack Meters and Vibration during construction to reduce damage and disputes with neighbors

Pre-construction Condition Survey

Pre-construction condition survey (Dilapidation Survey)

Photos, video and records of the location and size of existing cracks in buildings around the project, before piling, excavation or demolition

  • Deliverable existing condition (Baseline) report with survey point plan
  • Best for construction next to houses, buildings, communities
Survey procedure →

Building Settlement Point

Building settlement markers

Markers on columns or walls of adjacent buildings, levels read with an Auto Level against benchmarks to assess differential settlement

  • Measures settlement and Differential Settlement
  • Best for buildings around deep excavation and dewatering
Settlement Point and Tiltmeter →

Crack Meter

Crack width gauge

Installed across key cracks, read manually (Crack Gauge) or Vibrating Wire type connected to a Datalogger, to see whether cracks are still widening

  • Measures crack opening and closing (mm)
  • Best for buildings with existing cracks, dispute cases
Which cracks are dangerous? →
DIN 4150-3

Vibration Monitoring

Vibration monitoring (PPV)

3-axis Geophones on adjacent building foundations record PPV continuously during piling, demolition or compaction, compared with the National Environment Board Notification No. 37 (B.E. 2553 (2010)) criteria

  • Measures PPV (mm/s) and frequency
  • Best for piling, demolition, soil compaction
How vibration is monitored →
Automatic Monitoring

How does automatic data acquisition give real-time alarms?

An Automatic Datalogger reads many instrument types at once, 24 hours a day, sends a Real-time Alert as soon as a reading exceeds its criteria, and displays results on a Cloud Dashboard with reports

Automatic Datalogger

Multi-channel automatic logging

Records every 1 minute to daily, supports Vibrating Wire, 4-20mA and RS-485 instruments, transmits data via 4G/WiFi

  • Best for frequent readings or hard-to-reach points

Real-time Alert

Threshold alarms

Multiple alarm levels, instant alerts by LINE, SMS or Email when any reading reaches its set limit

  • Best for deep excavation next to buildings, 24/7 monitoring

Cloud Dashboard & Report

Online trend charts and periodic reports

The project team can view charts from anywhere at the same time; PDF/Excel reports exported on schedule

  • Best for owners, designers and supervising engineers
Manual vs Automatic Monitoring →
Not sure which instruments your project needs, or how many?

Send the construction drawings, site plan or specifications (Spec / TOR / EIA conditions). SPN engineers will propose instrument types, locations and reading frequency, with a quotation within 24 hours

Click a photo to enlarge
Drilling and installing a Monitoring Well — SPN
OW — Install
Drilling and installing a Monitoring Well
Monitoring Well No.1 installation completed
OW — Done
Monitoring Well No.1 installation completed
Piezometer 8m, Samut Prakan — SPN Instrumentation
Piezometer
Piezometer 8m — Samut Prakan
Groundwater level monitoring with Piezometer — SPN
Piezometer
Groundwater level monitoring
Settlement Plate Steel Pin diagram — SPN
Settlement Plate
Settlement Plate — Steel Pin/Pipe diagram
Deep Settlement markers, Grandio Bang Na Km 5 project
Deep Settlement
Deep Settlement — Grandio Bangna Km.5
Installing Inclinometer casing, Kraseaw Hydropower — SPN
Inclinometer
Installing Inclinometer casing — Kraseaw Hydropower
Drilling and installing Inclinometer casing BH-1 — SPN
Inclinometer
Drilling and installing Inclinometer casing BH-1

Which projects has SPN instrumented?

Case studies published on our website (charts in the articles illustrate principles and are not actual monitoring data)

Inclinometer · Bang Phli, Samut Prakan

Deep excavation beside sheet piles in soft clay

Inclinometer casing installed in a borehole behind the sheet pile line, read throughout excavation to track lateral soil movement

  • ASTM D6230
  • Bangkok soft clay
Read the full case study →
Deep Settlement · Grandio Bang Na Km 5

Settlement measured layer by layer

Deep Settlement Points installed in borehole BH-DSP measure soil settlement at several depths, showing which layer settles most — unlike a Settlement Plate, which measures only at the surface

  • Borehole BH-DSP
  • Multiple depths
Read the full case study →
Piezometer + Monitoring Well · Samut Prakan

Monthly groundwater level monitoring

Standpipe Piezometer with its tip at 8 m depth, paired with a Monitoring Well in soft clay, read monthly to track groundwater level and pore water pressure in the soil

  • Piezometer 8 m
  • Monthly readings
Read the full case study →
Inclinometer · Kraseaw Hydropower, Suphan Buri

Monitoring hillside slope movement

Borehole BH-1 drilled, Inclinometer casing installed and baseline read, to find whether the slope is moving and at what depth, in hillside colluvium over weathered rock

  • Borehole BH-1
  • Slope, Dan Chang District
Read the full case study →
Work process

What is the process for instrumentation with SPN?

From planning monitoring points to the interpreted report — see which projects need a monitoring plan in When is instrumentation required?

  1. Send project information

    Construction drawings, site plan, soil investigation results and monitoring requirements (Spec / TOR / EIA conditions) by LINE or email

  2. Plan instrument locations and types

    Our engineers propose instrument types, number of points, depths and reading frequency together with the designer, with a quotation

  3. Install and prepare As-built records

    Drill and install at approved locations, recording the actual coordinates, elevation and depth of every instrument

  4. Baseline readings

    Readings taken several times before construction starts until stable, used as the reference for all changes

  5. Scheduled or automatic readings

    Daily, weekly or monthly readings as planned, or via Datalogger with alarms when readings reach criteria

  6. Reports and interpretation by engineers

    Periodic reports with trend charts compared with alarm criteria, plus a final summary report at completion, signed by an engineer

3-level alarm criteria (Trigger Levels)

Criteria for each level are set by the project designer or consultant. SPN sets the criteria in the system and reports immediately when readings reach them

Normal

Readings within criteria

Readings below the alert level; work and readings continue on the normal schedule

Alert

Alert Level

Increase reading frequency, inspect the site and notify the supervising engineer and designer

Action

Action Level

Stop or change construction methods and agree remedial measures with the designer

Geotechnical Instrumentation Services — SPN Soil Engineering

SPN Soil Engineering installs and reads a full range of instruments that monitor soil and structural behavior, from Settlement Plates, Piezometers and Inclinometers to automatic real-time Datalogger systems, for construction that needs continuous stability monitoring such as deep excavations, embankments and projects with EIA reporting, nationwide across Thailand. See real installation case studies: Inclinometer, deep excavation in Bang Phli · Deep Settlement Point, Bang Na · Piezometer and Monitoring Well, Samut Prakan · Inclinometer, Kraseaw Hydropower slope. For an overview before choosing, read Geotechnical Instrumentation: what it is and 10 types used in practice. Installation follows ASTM D6230 (Inclinometer) and ASTM D7764 (Vibrating Wire Piezometer), and vibration monitoring is compared with the National Environment Board Notification No. 37 (B.E. 2553 (2010)) and DIN 4150-3. The work is carried out by the same engineering team as SPN's soil investigation

1. Settlement Monitoring

Tracks settlement of soil and structures from the surface to deep soil layers, to verify the design and assess the progress of consolidation

  • Settlement Plate Measures settlement of the original ground under fill with a 60×60 cm Steel Plate placed at the base of the fill (original ground surface before filling) with a steel rod extended upward; read with an Auto Level every round. Suitable for embankments, roads and projects using Preloading to accelerate consolidation of soft clay
  • Multi-level Settlement Point Measures settlement of soil layers at different depths, layer by layer, to identify which layer settles most and to verify theoretical Consolidation Settlement
  • Extensometer (Rod / Magnetic) Measures settlement or Heave along a borehole at several depths. The Rod type anchors steel rods at each level and is read at the borehole head; the Magnetic type uses magnetic rings around a pipe with positions read by a probe. Suitable for deep excavation bases, high embankments and tunnels
  • Surface Settlement Marker Measures vertical movement of the ground surface around excavations and underground construction, helping detect settlement of adjacent buildings and roads around the project — see also 5 warning signs of foundation problems

2. Pore Pressure and Groundwater Level (Piezometer & Observation Well)

Continuous monitoring of pore water pressure and groundwater level to assess stability and drainage performance

  • Standpipe Piezometer Measures the Piezometric Level in a defined depth zone. Simple, low cost, quick to install and read with a Water Level Meter. Suitable for long-term monitoring and EIA projects that need monthly water level data
  • Vibrating Wire Piezometer Measures Pore Water Pressure at a specific point in the soil using a vibrating steel wire. High accuracy, fast response and automatic Datalogger support. Suitable for deep excavations, Preloading and projects that need Real-time Monitoring (detailed comparison with the Standpipe type in What is a Piezometer?)
  • Observation Well (Monitoring Well) An Open Standpipe groundwater observation well drilled to the soil layer of interest to track seasonal changes in groundwater level and construction impacts. Used for EIA projects and Environmental Monitoring — read installation, reading and precautions in Observation Well for groundwater level

3. Lateral Movement Monitoring

Measures tilt and lateral movement of soil and structures, giving warning before collapse or damage

  • Inclinometer Measures the lateral movement profile of soil and retaining walls with depth. An Inclinometer Probe is lowered into an ABS casing installed in the ground, tilt is recorded every 0.5 m and the displacement profile of the whole column is calculated, giving warning before failure — read the principles and how to read results in What is an Inclinometer?
  • Tiltmeter Measures tilt of structures, piles, retaining walls and buildings near excavations. Installed directly on the structure, it gives data faster than an Inclinometer and suits work that needs Real-time Alerts — read point layout and alarm criteria for adjacent building monitoring in Settlement Point and Tiltmeter
  • Total Station / Prism Monitoring Prism targets are fixed on buildings, retaining walls or key structures and sighted with a Total Station from benchmarks outside the zone of influence, giving 3D (X-Y-Z) movement of many points in one round. Uses the same team and equipment as SPN's surveying

4. Structural Load and Stress Monitoring (Load & Stress)

Measures the actual forces in struts, ground anchors, walls and piles for comparison with design values

  • Strain Gauge Measures strain in rebar, beams and highly loaded steel structures to verify actual forces against calculated values. Suitable for Struts, Anchors, Pile Caps and special structural members — read how strain is converted to force and how to choose sensors in Strain Gauges in geotechnical work
  • Load Cell Installed between the Strut end and the Waler or under the Ground Anchor head to measure compression or tension directly, without section conversion; can be cross-checked with Strain Gauges
  • Earth Pressure Cell (Total Pressure Cell) A fluid-filled cell connected to a pressure transducer, set on the retaining wall face, under a footing or in an embankment to measure the actual total earth pressure on the structure
  • Instrumented Pile Strain Gauges at several levels and Telltales are installed in a test pile, which is then static load tested to ASTM D1143 to separate skin friction in each soil layer from end bearing — read more in Instrumented Static Load Test

5. Adjacent Building and Vibration Monitoring

Records existing conditions before work starts and measures impacts during construction to reduce damage and disputes

  • Pre-construction Condition Survey (Dilapidation Survey) Survey, photographs and records of the location, length and width of existing cracks in buildings around the project before piling, excavation or demolition, compiled into a report with a survey point plan — read Adjacent building survey before construction
  • Building Settlement Point Level markers fixed on columns or walls of adjacent buildings, read with an Auto Level against benchmarks to track settlement and Differential Settlement
  • Crack Meter Installed across key cracks, read manually or Vibrating Wire type connected to a Datalogger, to see whether cracks are still widening or have stopped — read Which structural cracks are dangerous?
  • Vibration Monitoring 3-axis Geophones installed on adjacent building foundations continuously record peak particle velocity (PPV) and frequency during piling, demolition or soil compaction, compared with the National Environment Board Notification No. 37 (B.E. 2553 (2010)) or DIN 4150-3 as the project specifies — read Vibration monitoring during pile driving

6. Datalogger and Remote Monitoring

Automatic data logging and mobile alerts when readings exceed set limits (compared with readings by field staff: Manual vs Automatic Monitoring)

  • Automatic Datalogger Records instrument readings at set intervals, from every 1 minute to daily, stores data on a Memory Card and uploads to a Cloud Server via 4G/WiFi. Supports Vibrating Wire, 4-20mA and RS-485 instruments on multiple channels at once
  • Real-time Alert System Thresholds trigger automatic SMS/Line/Email alerts when any reading exceeds safe limits, so engineers can decide immediately without waiting for site readings. Suitable for projects that need 24/7 Monitoring
  • Cloud Dashboard & Report Real-time data on an online Dashboard, automatic trend charts and PDF/Excel reports exported on schedule; the engineering team can access it from anywhere at the same time

Summary of instruments and applications

← Scroll to see the full table →

InstrumentMeasurementAccuracy (typical)Datalogger supportApplications
Settlement PlateSettlement under fill±1 mmNo (read with Auto Level)Embankments, Preloading
Multi-level SettlementSettlement by layer±1 mmYes (VW Sensor)Consolidation analysis
Standpipe PiezometerWater pressure at a point±10 mmYes (Pressure Transducer)EIA, long-term
Vibrating Wire PiezometerPore water pressure±0.1 kPaYes (VW Datalogger)Excavation, Preloading
Observation WellOverall groundwater level±10 mmYes (Diver Logger)EIA, Environmental
InclinometerLateral movement±0.1 mm/mYes (In-place Inclinometer)Excavation, retaining walls
TiltmeterStructural tilt±0.01°Yes (Wireless)Real-time Alert
Strain GaugeSteel strain±1 μεYes (VW Datalogger)Strut, Anchor, Pile
ExtensometerSettlement/heave with depth±1 mm (Magnetic) · ±0.1 mm (Rod)Yes (Rod + Transducer)Excavation base, high embankments
Total Station / Prism3D movementmm level (depends on sight distance)Scheduled readingsBuildings, retaining walls
Load CellStrut/anchor forceApprox. ±0.5% of rangeYes (VW Datalogger)Strut, Ground Anchor
Earth Pressure CellTotal earth pressureApprox. ±0.1–0.5% of rangeYes (VW Datalogger)Retaining walls, under footings
Instrumented PileLoad distribution in piles±1 με (VW Strain Gauge)Yes (VW Datalogger)Static Load Test
Building Settlement PointBuilding settlement±1 mmNo (read with Auto Level)Adjacent buildings
Crack MeterCrack width0.01–0.1 mmYes (VW Crack Meter)Buildings with existing cracks
Vibration MonitorPPV and frequencyFiner than 0.1 mm/sYes (continuous recording)Piling, demolition

Projects that should be instrumented

Criteria for deciding whether a project needs a monitoring plan, and when to start baseline readings, are in When is instrumentation required?

  • Deep excavations in urban areas Near existing buildings, subways and utility pipes — Settlement, Lateral Movement and Pore Pressure must be monitored to prevent damage to adjacent property, together with earth retaining system design. See monitoring planning for deep excavations in Bangkok soft clay in Deep excavation monitoring in Bangkok soft clay
  • Large embankments and dams Settlement and stability monitored throughout the project life; Piezometer data helps check Seepage and embankment safety
  • Projects with EIA reporting Impacts on groundwater and the environment monitored under conditions set by the regulator. See also environmental assessment services
  • Ground improvement with PVD + Preloading Checks consolidation progress (Degree of Consolidation) and the right time to remove the Surcharge. For an overview of ground improvement, read 8 methods to improve soft soil before construction
  • Construction near existing structures Differential Settlement and Lateral Movement monitored to prevent damage to existing foundations, relevant to house settlement and house extensions
  • Pile driving, bored piling and demolition near buildings Survey adjacent buildings before work starts, install Crack Meters and monitor vibration during work to keep evidence and control impacts — read Pile driving cracked the house next door?

Key facts: what do you get from SPN instrumentation, and how often are readings taken?

Services
Settlement, groundwater, lateral movement, structural loads, adjacent buildings and vibration, and automatic data acquisition
Main standards
ASTM D6230 (Inclinometer) · ASTM D7764 (Vibrating Wire Piezometer) · DIN 4150-3 / BS 7385 and National Environment Board Notification No. 37 (vibration)
Reading frequency
Daily, weekly or monthly as planned, or automatic 24-hour Datalogger readings with 3-level alarm criteria
Deliverables
As-built instrument locations and depths · Baseline readings · periodic reports with trend charts and a final report signed by an engineer
Service area
Nationwide, all 77 provinces, from our office in Bang Sao Thong, Samut Prakan
Contact
Tel. +66 64 746 9601 · LINE @spnth · info@spnth.com

Frequently asked questions — geotechnical instrumentation

Geotechnical Instrumentation is the installation of instruments that measure soil and structural behavior to monitor settlement, pore water pressure and lateral movement. The data helps verify the design, gives early warning and supports EIA reports

A Settlement Plate is a 60×60 cm steel plate placed on the original ground before filling, with a steel rod extended above the fill. It measures settlement of the original ground under embankments, roads and Preloading projects that accelerate consolidation of soft soil. Levels are read with an Auto Level every round

A Piezometer measures Pore Water Pressure at a specific depth. Types include Standpipe (low cost) and Vibrating Wire (high accuracy, Datalogger-compatible). An Observation Well measures the overall groundwater level of a soil layer and suits long-term monitoring and EIA work

An Inclinometer measures tilt and lateral movement with depth. A probe is lowered into an ABS casing installed in the ground, tilt is recorded every 0.5 m, and the displacement profile of the whole column is calculated, giving warning before failure

Vibrating Wire offers high accuracy and fast response, can measure continuously and automatically via a Datalogger, and alarms when readings exceed a threshold. A Standpipe costs less but is normally read by hand (a Pressure Transducer can be added for automatic readings) and responds more slowly in clay because water must flow in and out of the pipe (Time Lag)

A Datalogger records readings automatically at set intervals and sends data via 4G/WiFi to a Cloud Server. Thresholds trigger automatic SMS/Line/Email alerts when readings exceed safe limits. It supports several instrument types at once

Yes. SPN takes readings on schedule (daily, weekly, monthly) and provides trend chart reports, engineering interpretation and recommendations, delivered as PDF and Excel

They should be installed before construction starts to record Baseline data on soil and groundwater under normal conditions, then monitored continuously during and after construction to compare changes and make informed project decisions

ASTM D6230 for movement monitoring with Inclinometers and ASTM D7764 for acceptance testing of Vibrating Wire Piezometers before installation, together with the instrument manufacturer's manuals. Vibration monitoring is compared with the National Environment Board Notification No. 37 (B.E. 2553 (2010)) or DIN 4150-3 as the project specifies, and instrumented piles are static load tested to ASTM D1143. Work is supervised and results certified by a COE-licensed civil engineer

SPN installs 3-axis Geophones on the foundation or structure of adjacent buildings, records peak particle velocity (PPV, mm/s) with frequency, and compares it with the National Environment Board Notification No. 37 (B.E. 2553 (2010)) or DIN 4150-3 / BS 7385-2 as the project specification requires

It should be done before piling, excavation or demolition starts: photos, video and records of the location, length and width of existing cracks, with a report and survey point plan. It serves as evidence to compare with post-construction conditions and helps reduce disputes with neighbors

A Load Cell measures force directly, installed between the strut end and the waler or under the Ground Anchor head. A Strain Gauge measures strain on the member surface, converted to force using the cross-sectional area and material modulus; several are usually installed around the section to get the average force. Both can be used together as a cross-check

An Instrumented Pile is a test pile fitted with Strain Gauges at several levels and Telltales during manufacture or before concreting. When static load tested to ASTM D1143 it gives the load distribution along the pile, separating skin friction in each soil layer from end bearing, while a normal test only gives the load-settlement curve at the pile head

Price depends on instrument type, number of points, depth, site conditions and reading frequency/monitoring period. Contact us for a free quotation at +66 64 746 9601; our engineers reply within 24 hours